Fabrication Processes (name some) |
CNC milling, CNC turning, Precision Grinding, EDM Machining, profile extrusion, laser cutting, welding, casting, bending, surface finish, etc | |
Materials (name some) |
Aluminum | AL6061, AL6063,AL7075,AL5052, etc |
Stainless Steel | S.S.303, S.S.304, S.S.316, S.S.316L, etc. | |
Steel | Mild steel, Carbon steel, 4140, 4340, Q235, Q345B, 20#, 45# etc | |
Iron | 1213, 12L14,1215 etc. | |
Brass | C36000 ( C26800), C37700 ( HPb60), C38500( HPb58), C27200(CuZn37) , C28000(CuZn40), etc | |
Bronze | C51000, C52100, C54400, etc. | |
Plastic | ABS, PC, PEEK, POM, Nylon, Acrylic, etc. | |
Surface Finish (name some) |
anodizing, chemical film, oxide, zinc-plated, nickel-plated, chrome-plated, silver-plated, gold-plated, Teflon coating, heat treatment, passivation, sandblasting, brushing, polishing, powder coating, etc | |
Tolerance:
(name some) |
1. CNC Turning tolerance: +/-0.01mm
2. CNC Milling Tolerance: +/-0.01mm 3. WEDM tolerance: +/-0.01mm 4. EDM Mirror tolerance: +/-0.005mm 5. Precision Grinding: +/-0.005mm |
|
Drawing Format | PDF/DWG/IGS/STEP/X_T | |
Packing | Wood case or carton, 1 With plastic bag and pearl-bubble bag. 2 To be packed in cartons or wood cases. 3 Use adhesive tape to seal cartons or nail screws to tighten the wood case. Different packing methods will be chosen according to different projects to ensure safe shipping. |
|
Shipping | 1) 0-100kg: by express or by air as priority. It takes 3 to 5 days by express, like DHL, UPS, and FedEx. And 5 to 12 days by air.
2) >100kg: by sea as a priority. It takes 15 to 40 days. |
|
MOQ | 1PCS | |
Trade Terms | EXW, FOB, CIF, As per customer’s request | |
Payment Terms | PayPal or T/T | |
Lead Time | 5 to 7 days for rapid prototypes, and it depends on order quantity and complexity |